Hi everyone today I'm going to share some issues that is delay until now no action taken by 2010 JMB .
1st case : look at this picture .
2010 JMB can buy so many pillar at our visitor car park but why, that they can't patch up this hole for residences convenience ...is it because they are so busy thinking in making money on renting out this visitor car park to residence that they forgot to think on the residences needs.It is already been 1 month this hole is here ...how much is this going to cost comparing with the cost of all those pillars.
2nd case : look at this pictures.
Its has been 2 months this renovations works been going on until now it seem that its like "projek terbengkalai" what wrong with this progress , no update by our 2010 JMB to residences it just like taking it easy not important for residence ... Especially during now school holiday nothing can be utilized at this areas.No basket ball , No tennis , No futsal nothing can be played here.2010 JMB should follow up on this matter fast or it will be delay again.This is for the residence not to see but to used.
I really Hope That 2010 JMB not sitting on this Matters ..
That all for now
Thanks .
Dec 3, 2010
Nov 9, 2010
Some More Important Issue As Residence We Should Be Aware Because This Is All Our Money ...
Hi!! Everyone today I'm going to share something to as a waste of our money as maintenance fees that we pay every months .
As we all know that all this time we have been hearing JMB has no money to do improvement for us as residences, but now the 2010 JMB is doing some improvement as to me its good but if they cannot know which is to spend and which is to saved then development without control will become a waste .As to me what is control it is Discipline.
What is here are some example that we all can evaluated as whether this problems is UN avoidable or just been ignore by the new 2010 JMB.
My Principal is There "Is No Bad Student Only Bad Leader".
1st Scenario : Look at this picture : Look at the long light on the cycling its open all day long since 1 week ago .The reason given by the management that, this light switch is centralised with the others light inside our ground floor and if we closed it all the light inside will also be closed and dark , is something to me that unacceptable because we have technician that can do something about it rather than leave it be like that to waste everyday .
2nd Scenario : Look at this picture Below , All this visitors car park this few weeks has been occupied by people that is not visitors and some is residence that would not want to go up the multi storey car park at their own parking lot . All this cars has no visitors pas card leave on theirs dashboard of the cars.To me now 2010 JMB have to strict and fair to all as what i can say this is not fair for the rest of the residence and visitors.
3rd Scenario : Residence has been given statement today 08.11.2010 Of Oct 2010 Monthly statement payment made and outstanding maintenance fees.Behind this is a Notice stating that to confirm the statement of accounts given. Now below are Picture one sample of a problem statement , in this statement Jiran wangi clerk has done some adjustment with chop of JMB by the JIRAN WANGI SDN BHD.
My Question Is :
1. When this statement given back to questions the mistake done by them the clerk open out the ledger of collections collected manually to check and confirm the mistake . But why initially they have not check with this ledger before doing this statement out to residence ?.
2. Looking at the statement the Debit and credit is not presented as monthly account statement rather then to me it is just like a letter to residence as formality to get the opening cash balance from Robert bench . Why is if residence that pay in advance 3 month the amount credited out from the month of this statement Oct 2010 is RM330.00 Not RM110.00 Per a month Making the balance is RM220.00. Not RM0.00 As balance ?.
3. What If residence didn't come back to them to rectified the mistake after 14 day , what happen the the money that is the different amount in this case the RM220.00 ?.Where is it going to be keep as Excess Money?.
4. To me know how is the one working for who ?. we residence have check and correct the work that initially they should check before they shoot this statement out ?.
5. How does this clerk going to do adjustment on the mistake at theirs side , when she just chop and amend this statement and give back this statement to me without photocopying this amendment and ask me to sign like what been instructed on the letter given, so that their head offices will know there is a amendment for my statement ?.I will go back to the maintenance office tomorrow to rectified this.
6. Do 2010 JMB check all this ?.
So far i have been told the same mistake from my other neighbour
All this raise the Credibility , Accountability and Transparencies Question in my head to 2010 JMB.
I hope every residence really check this statement and go back if there is anything wrong with it , the most important thing now is to keep all your receipts carefully NOW , THEN and EVER.
That all for now
From people that care .
As we all know that all this time we have been hearing JMB has no money to do improvement for us as residences, but now the 2010 JMB is doing some improvement as to me its good but if they cannot know which is to spend and which is to saved then development without control will become a waste .As to me what is control it is Discipline.
What is here are some example that we all can evaluated as whether this problems is UN avoidable or just been ignore by the new 2010 JMB.
My Principal is There "Is No Bad Student Only Bad Leader".
1st Scenario : Look at this picture : Look at the long light on the cycling its open all day long since 1 week ago .The reason given by the management that, this light switch is centralised with the others light inside our ground floor and if we closed it all the light inside will also be closed and dark , is something to me that unacceptable because we have technician that can do something about it rather than leave it be like that to waste everyday .
2nd Scenario : Look at this picture Below , All this visitors car park this few weeks has been occupied by people that is not visitors and some is residence that would not want to go up the multi storey car park at their own parking lot . All this cars has no visitors pas card leave on theirs dashboard of the cars.To me now 2010 JMB have to strict and fair to all as what i can say this is not fair for the rest of the residence and visitors.
3rd Scenario : Residence has been given statement today 08.11.2010 Of Oct 2010 Monthly statement payment made and outstanding maintenance fees.Behind this is a Notice stating that to confirm the statement of accounts given. Now below are Picture one sample of a problem statement , in this statement Jiran wangi clerk has done some adjustment with chop of JMB by the JIRAN WANGI SDN BHD.
My Question Is :
1. When this statement given back to questions the mistake done by them the clerk open out the ledger of collections collected manually to check and confirm the mistake . But why initially they have not check with this ledger before doing this statement out to residence ?.
2. Looking at the statement the Debit and credit is not presented as monthly account statement rather then to me it is just like a letter to residence as formality to get the opening cash balance from Robert bench . Why is if residence that pay in advance 3 month the amount credited out from the month of this statement Oct 2010 is RM330.00 Not RM110.00 Per a month Making the balance is RM220.00. Not RM0.00 As balance ?.
3. What If residence didn't come back to them to rectified the mistake after 14 day , what happen the the money that is the different amount in this case the RM220.00 ?.Where is it going to be keep as Excess Money?.
4. To me know how is the one working for who ?. we residence have check and correct the work that initially they should check before they shoot this statement out ?.
5. How does this clerk going to do adjustment on the mistake at theirs side , when she just chop and amend this statement and give back this statement to me without photocopying this amendment and ask me to sign like what been instructed on the letter given, so that their head offices will know there is a amendment for my statement ?.I will go back to the maintenance office tomorrow to rectified this.
6. Do 2010 JMB check all this ?.
So far i have been told the same mistake from my other neighbour
All this raise the Credibility , Accountability and Transparencies Question in my head to 2010 JMB.
I hope every residence really check this statement and go back if there is anything wrong with it , the most important thing now is to keep all your receipts carefully NOW , THEN and EVER.
That all for now
From people that care .
Nov 6, 2010
Another Implementations By 2010 JMB That In Vain And Jeopardizing Our Building Security.
Hi!..Everyone , today i have just notices that at our car park level 1 entry and exits point connecting to the multi storey car park and block A / B building at the gate got 1 small button that we can push without using our excess card and open the gate to enter our car park area.
Look at this picture :
The White Button If We Push It Can Open The Gate To Enter Our Car Park . |
Look At From Different Angle :
Different Angle View |
Different Angle View |
My Questions Is :
1. Is this secure to leave the contractors door open without guard ( picture as below ) and now make new button for people that don't have card to exit this gate ( above picture ) through our car park ?.
2. What is the justifications to have this button when earlier the 2010 JMB has already given out to residents a letter telling us that they as strengthening the security and advising us always to have the excess card to in and out this building ?.
3. Even though we have camera , but if the thief or anyone that have committed crime in this building can just walk in and out using any of these 2 doors . who can reconised it and know it ?.
Look At this Picture :
Building Contractors Door View At Block B Ground Floor Near Lifts With NO Guards |
Building Contractors Door View At Block B Ground Floor Near Lifts With NO Guards |
Building Contractors Door View At Block B Ground Floor Near Lifts With NO Guards |
Oct 28, 2010
IMPORTANT ISSUES STILL HAVEN'T BEEN SETTLED BY 2010 JMB
Hi!.. Everyone I'm highlighting things that really important to us as residences of serinabay apartment .
apart from all the development bring by the current JMB 2010 but yet have not been declare by them
1. UN audited account from December 2008 to November 2009 ( 1 set Of accounts ) And December 2009 to November 2010 JMB ( 1 Set Of accounts ) initially when I'm the chairman of 2010 JMB for the first 3 months , i have already sign document saying that Robert bench will only be resign after they have settled making accounts From December 2008 to the agreement Letter dated 23.06.2010 and audited in Oder for them to be released by 2010 JMB , but now the accounts as far as now has not been declared and presented to resident yet has not been audited but Robert Bench has been replaced by Jiran wangi . I hope the Current Chairman Of JMB 2010 , will consider this as really important in order for them to hand over In future for the new JMB 2011.
Notes : About Accounts history .
Kasporat Developer
December 2007 until November 2008 Accounts Has been audited And presented To COB
FA Resources / JMB 2009 / Robert Bench
December 2008 Until November 2009 Accounts Has not been audited and presented to COB
- Fa Resources last working day JULY 2009
- Robert Bench Take Over AUGUST 2009
Robert Bench / JMB 2010 / JIRAN WANGI
December 2009 to November 2010 Accounts Has Not been audited and presented to COB.
- 2010 JMB take over 19.06.2010
- Robert Bench Last Working Day SEPTEMBER 2010.
- JIRAN WANGI take over 1st OCTOBER 2010.
2. Strata Titles : until now there is no feedback from 2010 JMB and developers Or our lawyer regarding our strata titles . just to share according to law no renovations can be made to extend the extra 200sft to b renovated as rooms or any other works until strata is out .But now everyone has already do renovations i don't know from where does this authorisations comes from. If we see our S&P agreement its just tell us the house size is 700sft only Extra 200sft is common areas. I really hope that Our strata Titles has no problem in getting it and renovations that has been done would not be effected.
Please residence take notes on this matter , cause it is really important to us in saying this units belong to us.
That all for now
All the Best
apart from all the development bring by the current JMB 2010 but yet have not been declare by them
1. UN audited account from December 2008 to November 2009 ( 1 set Of accounts ) And December 2009 to November 2010 JMB ( 1 Set Of accounts ) initially when I'm the chairman of 2010 JMB for the first 3 months , i have already sign document saying that Robert bench will only be resign after they have settled making accounts From December 2008 to the agreement Letter dated 23.06.2010 and audited in Oder for them to be released by 2010 JMB , but now the accounts as far as now has not been declared and presented to resident yet has not been audited but Robert Bench has been replaced by Jiran wangi . I hope the Current Chairman Of JMB 2010 , will consider this as really important in order for them to hand over In future for the new JMB 2011.
Notes : About Accounts history .
Kasporat Developer
December 2007 until November 2008 Accounts Has been audited And presented To COB
FA Resources / JMB 2009 / Robert Bench
December 2008 Until November 2009 Accounts Has not been audited and presented to COB
- Fa Resources last working day JULY 2009
- Robert Bench Take Over AUGUST 2009
Robert Bench / JMB 2010 / JIRAN WANGI
December 2009 to November 2010 Accounts Has Not been audited and presented to COB.
- 2010 JMB take over 19.06.2010
- Robert Bench Last Working Day SEPTEMBER 2010.
- JIRAN WANGI take over 1st OCTOBER 2010.
2. Strata Titles : until now there is no feedback from 2010 JMB and developers Or our lawyer regarding our strata titles . just to share according to law no renovations can be made to extend the extra 200sft to b renovated as rooms or any other works until strata is out .But now everyone has already do renovations i don't know from where does this authorisations comes from. If we see our S&P agreement its just tell us the house size is 700sft only Extra 200sft is common areas. I really hope that Our strata Titles has no problem in getting it and renovations that has been done would not be effected.
Please residence take notes on this matter , cause it is really important to us in saying this units belong to us.
That all for now
All the Best
Oct 14, 2010
Another Good Effort But Still Theres A Loop Hole To Improve Other Wise It will Be A Waste Of Our Money.
Hi! Everyone ...Its seem That Now Our 2010 JMB Is Working For Improvement , But Still I Can see Some Loop hole That Can be Put Into Considerations As If It Not Been Rectified It Will Be A waste Of Our Residences Money ....
Look At this Picture :
But Now Look At this Picture :
Look At this Picture No Rela Units Posted There By The 2010 JMB :
Now Look At This Picture See How Many Escape Roots Available Here If A Thief Going To Escape :
A Thief Will Never Used The Front Escape Roots Because Its Too Public In The Day , But Good At Night .
A Lot Of Scenario We Can Think Of If This Door Left Unattended.
It Will Be A Waste To Have Invested Huge Sum For All The Door But Left This Door Like This .
In The End It Will Be Back At Square 1 = 0 Impact ( Good Intention But Poor Implementations )
I Think One Of the reason maybe 2010 JMB will Give : NO MONEY
But My Big Questions Is :
1. Why Initially When Going To engage New Security Company All This Aspect Has Not Been Consider : example : How many Man power needed , How many post Needs To Post Guard .
2. Where Is the Quotations Or Tender For this Security Company and Management Company
3. If there Is Quotations Of tender All Our requirement Will Be take as A must and Company can Offer Something More To Value add Our Requirement.
4. The Reason To Cut Cost Is something Irrelevant Compare To security The Most important aspect that we residence Pay the maintenance Even it Is costly but It Must be With good Quality ,
Sometime It is not Fair To ask For A Porche For The Prices Of A Proton.Its Has To Be A Win Win Situations.
Now If 2010 JMB Keep Pushing For More But Company Cannot Bare the cost It will Be back to Square One.
Hopefully They Can Solved It .
That All For Now .
Look At this Picture :
But Now Look At this Picture :
![]() |
| What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm. |
![]() |
| What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm. |
![]() |
| What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm. |
![]() |
| What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm. |
Look At this Picture No Rela Units Posted There By The 2010 JMB :
Now Look At This Picture See How Many Escape Roots Available Here If A Thief Going To Escape :
![]() |
| Right View |
![]() |
| Left View |
A Lot Of Scenario We Can Think Of If This Door Left Unattended.
It Will Be A Waste To Have Invested Huge Sum For All The Door But Left This Door Like This .
In The End It Will Be Back At Square 1 = 0 Impact ( Good Intention But Poor Implementations )
I Think One Of the reason maybe 2010 JMB will Give : NO MONEY
But My Big Questions Is :
1. Why Initially When Going To engage New Security Company All This Aspect Has Not Been Consider : example : How many Man power needed , How many post Needs To Post Guard .
2. Where Is the Quotations Or Tender For this Security Company and Management Company
3. If there Is Quotations Of tender All Our requirement Will Be take as A must and Company can Offer Something More To Value add Our Requirement.
4. The Reason To Cut Cost Is something Irrelevant Compare To security The Most important aspect that we residence Pay the maintenance Even it Is costly but It Must be With good Quality ,
Sometime It is not Fair To ask For A Porche For The Prices Of A Proton.Its Has To Be A Win Win Situations.
Now If 2010 JMB Keep Pushing For More But Company Cannot Bare the cost It will Be back to Square One.
Hopefully They Can Solved It .
That All For Now .
Oct 6, 2010
Good Intension But Poor And Bad Implementations Of Works Of Improvement Done By 2010 JMB Of Serina Bay Apartment
Hi Everyone !...I'm Going to Share Today Something To Me is
"Good Intention But Poor And Bad Implementations"
Done By Current 2010 JMB Member .
Look At this Picture :
MY SUGGESTIONS :
1. Clear Off ALL Rubbish Dump
2. Move Back the Steels Bars Up to 2 Feet's From The Fences
3. Properly Align Back In straight Line
4. To Obstruct People From Parking At the Locations In The First Picture Above , The steel Bars Will Have To Go In more Align In ,Straight Line Side To Side Of The Cements , Looking Like Straight Triangle Line.
5. Why Do We Have To Used Allot Of Steels Pipe Instead Of Using Chains Minimizing The Cost Of steels Bars. If Residents Still Park JMB Can just Clamp It .
6. The "No Parking Box" Draw On The Road At entrance Block C Should Be Bigger Reaching The Fences In straight Box Line .No Need The 2 Cone.
7. "No Parking Box" Should also been Draw at All Entrance And Place Where People Cannot Park Surrounding This Building.
That All For Now
All Residence Should Be Alert And Aware About Our Surrounding ,
JMB 2010 WORKS FOR US THE RESIDENCE OF SERINA BAY ,
NOT THE JIRAN WANGI ONLY AS MANAGEMENT .
THERE ONLY BAD LEADER NOT BAD FOLLOWER.
THEY HAVE TO BE ACCOUNTABLE AS FOR THEY HAVE HOLD POSITIONS AND UNDERSTAND THE COMMITMENT THEY HAVE TO GIVE WITH NO SALARY ...
"Good Intention But Poor And Bad Implementations"
Done By Current 2010 JMB Member .
Look At this Picture :
![]() |
| THE ALIGNMENT OF THE STEEL BARS AT THE SIDE IS NOT PROPERLY ALIGN PROPERLY AND STRAIGHT MAKING OUR ROAD NARROW. |
![]() |
| THE ALIGNMENT OF THE STEEL BARS AT THE SIDE IS NOT PROPERLY ALIGN PROPERLY AND STRAIGHT MAKING OUR ROAD NARROW. |
![]() |
| NOW LOOK AT THIS PICTURE WHY SOME ARE MORE THAN 2 FEET'S FROM THE FENCES SOME ARE LESS . THE STEEL BARS ARE NOT STRAIGHT AND NOT PROPERLY ALIGN . |
![]() |
| NOW LOOK AT THE RUBBISH DUMP THAT PLACED HERE FOR SO LONG , IS THIS WHY THE 2010 JMB HAVE DO LIKE THIS. "THIS CAN BE THE REASON BUT THIS IS NOT THE SOLUTIONS" |
![]() |
| NOW LOOK AT THE RUBBISH DUMP THAT PLACED HERE FOR SO LONG , IS THIS WHY THE 2010 JMB HAVE DO LIKE THIS. "THIS CAN BE THE REASON BUT THIS IS NOT THE SOLUTIONS" |
MY SUGGESTIONS :
1. Clear Off ALL Rubbish Dump
2. Move Back the Steels Bars Up to 2 Feet's From The Fences
3. Properly Align Back In straight Line
4. To Obstruct People From Parking At the Locations In The First Picture Above , The steel Bars Will Have To Go In more Align In ,Straight Line Side To Side Of The Cements , Looking Like Straight Triangle Line.
5. Why Do We Have To Used Allot Of Steels Pipe Instead Of Using Chains Minimizing The Cost Of steels Bars. If Residents Still Park JMB Can just Clamp It .
6. The "No Parking Box" Draw On The Road At entrance Block C Should Be Bigger Reaching The Fences In straight Box Line .No Need The 2 Cone.
7. "No Parking Box" Should also been Draw at All Entrance And Place Where People Cannot Park Surrounding This Building.
That All For Now
All Residence Should Be Alert And Aware About Our Surrounding ,
JMB 2010 WORKS FOR US THE RESIDENCE OF SERINA BAY ,
NOT THE JIRAN WANGI ONLY AS MANAGEMENT .
THERE ONLY BAD LEADER NOT BAD FOLLOWER.
THEY HAVE TO BE ACCOUNTABLE AS FOR THEY HAVE HOLD POSITIONS AND UNDERSTAND THE COMMITMENT THEY HAVE TO GIVE WITH NO SALARY ...
"SALARY CAN BE ALSO THE REASON BUT IT IS NOT THE SOLUTIONS"
Sep 8, 2010
Request By Mr Huzaifah To Me And Also The Residences Of Serinabay Apartment
Dear Residence , Mr Huzaifah Has Request Me To Take Out His Contact Number And Email as To Him This Is Personal Matter... So I hope All the Residence Understand That this Is his Personal Request.
This Can Be Solved If The Current 2010 JMB Will declare Out Their Organisations Chart with Picture And Contacts Number Like Normally You Can See At Other Flat Building Residential For The Residence Concern ....
What The current 2010 JMB Should Remember That , They Are Representing The Residences Here ..Promising To Residences To Hold Post And Do Community Works Here In Serinabay Where by Residence And JMB Should Be Working Together Closely ...Not Like Stay In Meeting Making Decisions But Not On the Ground Together Working Hand In Hand As Much Time That They Can Give.
This Is Community Work No pay Given . But A Community Servant Workers Should Always Take This As Your Motto
"I'm Doing This Because I Have agreed To Hold Positions And I Only hope Gods Will Repays Back All The Goodness , Responsibility And Commitment I Have Given Here"
So residence Please Don't Call Or Email Him And All The 2010 JMB Committees Okay.........
This Is A Copy Of Email Send To Me By Mr Huzaifah Magbool AJK OF 2010 JMB :
....................................................................................................................................................................
This Can Be Solved If The Current 2010 JMB Will declare Out Their Organisations Chart with Picture And Contacts Number Like Normally You Can See At Other Flat Building Residential For The Residence Concern ....
What The current 2010 JMB Should Remember That , They Are Representing The Residences Here ..Promising To Residences To Hold Post And Do Community Works Here In Serinabay Where by Residence And JMB Should Be Working Together Closely ...Not Like Stay In Meeting Making Decisions But Not On the Ground Together Working Hand In Hand As Much Time That They Can Give.
This Is Community Work No pay Given . But A Community Servant Workers Should Always Take This As Your Motto
"I'm Doing This Because I Have agreed To Hold Positions And I Only hope Gods Will Repays Back All The Goodness , Responsibility And Commitment I Have Given Here"
So residence Please Don't Call Or Email Him And All The 2010 JMB Committees Okay.........
This Is A Copy Of Email Send To Me By Mr Huzaifah Magbool AJK OF 2010 JMB :
....................................................................................................................................................................
History Repeating Again Lastime From Old JMB 2009 Now New JMB 2010
Hi everyone!.. Today I'm sharing With All The Residences What Is To Me History Repeating Again ...And I Blame It On The MASTERMIND Of 2010 JMB MR Steven Yong As 2010 JMB Sectary That Have Vito Power With His Follower Of 2010 JMB Comity's That Hold the Majority Vote In The 2010 JMB Comity's, And The Reason Why I Resign At First When I Know The Real Genuine Comity's Hold No Majority Against His Conspiracy Teams With His Own Agenda ...Using Racist Issue Indirectly To Make Issue And Questions My credibility In The Ends I Have Answer All And Still Proofs I'm Innocent .
I Have been Doing Checking On My Part Also shows That He At His Old House Also Making A lot Of problems To The Comity's There Now Move Here To Serinabay Apartment...
The Act Of Doing Things Without Transparency And Accountability After One JMB To The New One Right Now.
1. Engaging New Property Management Replacing Robert Bench Without Any Open tender To The public And Putting Out Notices Of Tender Open And Closing Date To the Notices Board ...
2. The Results Has To be Post Out To The notices Board As For Residences Concerns.
3. What Happen To The Code Of Conduct That He Has Introduce Preventing Me To Questions Robert Bench Before Making Me Just Like A Puppets... Is This A Act Of Righteousness .That Why I Would not Let My Self To Puppet To him And Resign.
Fact : Its doesn't Matter What The Reason Is Whether This New Company Prices Is Cheaper Or Higher Fees To Robert Bench Charges To Serinabay Apartment But It Has To Be Transparent And Declare Out To The Public.To Me What Is The 2010 JMB Doing Is Contradict With Penang State Government Policy CAT ( Credibility , Accountability And Transparency )
"Ini Seperti Cakap Tak Serupa Bikin"
For All Our Info All Project Give Out By State Government Now To Even RM5K Has To Have At Least 3 Quotations And State Government Has right To Ask The Winner To Less Out A bit More On the winning Amount If required.. As For Value For Money Concepts ...Example : YB Qoid Then Guan Award RM5K To the surau Of Serinabay Apartment To Extend The Rooftop But Needs To Have At Least 3 Quotations In Order To award It To Contractors That will Do this Works as Reasons This Is Public Money Not My Personals Money I Cannot Do this As What I like .....
But Now This Mr Steven Can Engage New Company For RM8K Without Any Quotations ..Now What Is This . Doesn't That Our Residences Money ... I Heard Some Of the Comity's Doesn't Agreed But Since He Has Follower And The Followers Holds Majority Vote He Has Vito Power...
This Is Why He Conspires Against Me Because I'm Trying To Implement Buying Procedures Like What I have Mentions In meeting But Taken out The Fact In Meeting Minutes send To COB ... A Lot of things has Been taken Out On My Resolutions Said Out In the 19.06.2010 AGM Meeting Minutes And when I Brings It In The 2010 JMB Meeting Been taken out Clearly ...Example : Buying RM2K Below What Is The Procedure , Buying More Then 2K To RM10K What Is The Procedure All Has Been Erased But Said Out Loud And Minuted In The AGM Meeting Minutes On 19.06.2010, But What I'm Very Sad Is His Followers In the 2010 JMB Comity's Follow Him Blindly Without Any Consent...This is The Other Reason Why I Resign ..And Raise A lot Of Questions?. Example What Is his Motifs And Agenda ..It Is Money Or Personal Satisfactions ?.
In Conclusions To Me Now :
THE CURRENT 2010 JMB IS DOING WHAT THE OLD 2009 JMB DOING MAKING DECISION WITHOUT RESIDENCES CONSENT AND TRANSPARENT .. NOT MAKING ANY CHANGES.
Dear Mr Steven I'm Not Scare Of You And Resign ... I Resign Is to Make Sure There Will Be A Check And Balance In Your Actions ... Just To Add Why Is You Always Hide Behind People Making Decisions But Yet Not Brave Enough To Replace My Post As Chairman Until Now ....
"Jangan Baling Batu sembunyi Tanggan"
Oop!!.. Sorry I Forgot You You Have Told Me Before That You Don't Understand Malay You didn't Go To The Sekolah Kebangsaan And You Don't Really Care About Malay Language.
Anyway I Think You Understand ....
I Have been Doing Checking On My Part Also shows That He At His Old House Also Making A lot Of problems To The Comity's There Now Move Here To Serinabay Apartment...
The Act Of Doing Things Without Transparency And Accountability After One JMB To The New One Right Now.
1. Engaging New Property Management Replacing Robert Bench Without Any Open tender To The public And Putting Out Notices Of Tender Open And Closing Date To the Notices Board ...
2. The Results Has To be Post Out To The notices Board As For Residences Concerns.
3. What Happen To The Code Of Conduct That He Has Introduce Preventing Me To Questions Robert Bench Before Making Me Just Like A Puppets... Is This A Act Of Righteousness .That Why I Would not Let My Self To Puppet To him And Resign.
Fact : Its doesn't Matter What The Reason Is Whether This New Company Prices Is Cheaper Or Higher Fees To Robert Bench Charges To Serinabay Apartment But It Has To Be Transparent And Declare Out To The Public.To Me What Is The 2010 JMB Doing Is Contradict With Penang State Government Policy CAT ( Credibility , Accountability And Transparency )
"Ini Seperti Cakap Tak Serupa Bikin"
For All Our Info All Project Give Out By State Government Now To Even RM5K Has To Have At Least 3 Quotations And State Government Has right To Ask The Winner To Less Out A bit More On the winning Amount If required.. As For Value For Money Concepts ...Example : YB Qoid Then Guan Award RM5K To the surau Of Serinabay Apartment To Extend The Rooftop But Needs To Have At Least 3 Quotations In Order To award It To Contractors That will Do this Works as Reasons This Is Public Money Not My Personals Money I Cannot Do this As What I like .....
But Now This Mr Steven Can Engage New Company For RM8K Without Any Quotations ..Now What Is This . Doesn't That Our Residences Money ... I Heard Some Of the Comity's Doesn't Agreed But Since He Has Follower And The Followers Holds Majority Vote He Has Vito Power...
This Is Why He Conspires Against Me Because I'm Trying To Implement Buying Procedures Like What I have Mentions In meeting But Taken out The Fact In Meeting Minutes send To COB ... A Lot of things has Been taken Out On My Resolutions Said Out In the 19.06.2010 AGM Meeting Minutes And when I Brings It In The 2010 JMB Meeting Been taken out Clearly ...Example : Buying RM2K Below What Is The Procedure , Buying More Then 2K To RM10K What Is The Procedure All Has Been Erased But Said Out Loud And Minuted In The AGM Meeting Minutes On 19.06.2010, But What I'm Very Sad Is His Followers In the 2010 JMB Comity's Follow Him Blindly Without Any Consent...This is The Other Reason Why I Resign ..And Raise A lot Of Questions?. Example What Is his Motifs And Agenda ..It Is Money Or Personal Satisfactions ?.
In Conclusions To Me Now :
THE CURRENT 2010 JMB IS DOING WHAT THE OLD 2009 JMB DOING MAKING DECISION WITHOUT RESIDENCES CONSENT AND TRANSPARENT .. NOT MAKING ANY CHANGES.
Dear Mr Steven I'm Not Scare Of You And Resign ... I Resign Is to Make Sure There Will Be A Check And Balance In Your Actions ... Just To Add Why Is You Always Hide Behind People Making Decisions But Yet Not Brave Enough To Replace My Post As Chairman Until Now ....
"Jangan Baling Batu sembunyi Tanggan"
Oop!!.. Sorry I Forgot You You Have Told Me Before That You Don't Understand Malay You didn't Go To The Sekolah Kebangsaan And You Don't Really Care About Malay Language.
Anyway I Think You Understand ....
Sep 1, 2010
Resignations Of Mr Ooi Beng Hock I am leaving my position as a committee member and all positions with effective Aug 31st 2010
Hai Everyone .. I Received A Email Today From Mr Ooi Beng Hock ( JMB AJK 2010 ) Saying That He Is Resigning .. Lately I Have Also Getting Phone Call Even Though I Have Allready Resign Earlyer Then Him ..So, In This Case For the Best Of All Residences Of Serinabay Apartment Since The 2010 JMB Have not declare Thiers JMB New Line up And Organisations Charts To Public Im Acting On best interest Of residents As Former Chairman Will List Out All The Remaining JMB 2010 Name And Contact No For Residences Inquiries.As For Sometime Resident Still Comfortable Contacting JMB rather then Robert Bench.
Re: Resignation
Dear All JMB members, Please accept this message as notification that I am leaving my position as a committee member and all positions with effective Aug 31st 2010. I've sms Mr.Steven Yong to convey this message to everyone since I don't have your contact numbers. I appreciate the opportunities I have been given at JMB and the professional guidance and support. I wish all and the JMB success in the future. Please let me know what to expect as far as my final work commitment is concerned. If I can be of assistance during this transition, please let me know. Sincerely, Ooi Beng Hock. |
Aug 17, 2010
Letter From Kementerian Perumahan Pretaining To My Defect Reports To The COB Komtar Future Actions And Explainations To Resident Right As Owner Lot Units Of Serenabay Apartment.
Hi !.. Everyone Its been long i have post any blog now , as you all know why ..
Today im going to share with all of you the latest news and letter i have received from
Jabatan Perumahan Negara ,
Kementerian Perumahan Dan Kerajaan Tempatan ,
Pusat Damansara , Kuala Lumpur
Dated : 04.08.2010 With No rujukan : ( 2 ) KPKT/(07)/COB/3-MPPP/42 .
This Is A CC Copy address personally to me , this is because im the one that shot a online complaint to the ministry and submited the defects report to them personally.
Here Is The letter Page 1 :
Here Is Page 2 :
This Is the Explainations Refering to "Act118,fasal ke 29 , Akta Pemajuan Perumahan ( Kawalan Dan Perlesenan ) 1966.
In this act this is what the residences / owners units lot / jmb / management right to claims from developers prosiding to any defect qouted under
"apa apa kecacatan , pengecilan atau kekurangan lain pada petak atau bangunan atau harta bersama yang menjadi ketara pada pembeli"
Example : Rooftop Units leakage And Common area defects
As for some common area defects,
earlyer developers PR Builders ( Formelry Known As Pembinaan Kasporat )
Has agree to repair back some of the common area defects based on good will even though the libility period has ended
promise and Answer by Mr Abdul Mutalib Bin Makdom Ghani ( Project Executive Of Kasporat ) on his letter to us post out at all notices board of Serinabay Apartment
with refference no : PKSB / BPBSB / S.BAY / COMDFCTS / AMMG 10 ( 037 )
Dated : 15.07.2010 To 2010 JMB Chairman That is me at that time.
1. Owner / JMB / Management must be given 24 months as warranty period by developers from the date of vaccant posession date start. ( we can see it inside Our S&P agreement ) can submit any complaint
2. Owner / JMB / Management within 24 months can issue out letter or complaint forms to developers on the defect acure at lot units or common area defect in serinabay apartment.
3. Owner / JMB / Management will have to wait and give developers 30 days from the date of the complaint forms or letter date, to come back with reply of the defects submited ( All the letter and complaints forms must have aknowledgement from developers ).Developers must reply .
4. After 30 day no reply by developers , Owner / JMB / Management Can ask for qoutations and submit this qoutations with the previous letter attached and with new letter telling the developers this is the cost to repair the defect at own cost and asking for future instructions from developers. In this letter owner / JMB / management is giving another 14 days for developer to act and reply this letter or Owner / JMB / Management will do it accordingly to the cost submited as Claims to developer.
5. After 14 Day from the 30 day earlyer No reply from developer , Owner / JMB / Management can angaged lawyer to issue out letter to the developer lawyer to release out the sum of claims needs to starts works on repairs.According to law the developer lawyer will have to release out the sum of money to the Owner / JMB / Management within 14 Day from the lawyer letter date given to the developer lawyer.
Fact : All these can be avoid if Old 2009 JMB And Robert Bench Management Company Act Accordingly to the rules and regulations. ( Buat Kerja Jangan Tidur Makan Gaji Buta )
Thats All For Now
Thanks
En Mohamad Amin Bin Abdul Kadir
HP : 012-4210765
Today im going to share with all of you the latest news and letter i have received from
Jabatan Perumahan Negara ,
Kementerian Perumahan Dan Kerajaan Tempatan ,
Pusat Damansara , Kuala Lumpur
Dated : 04.08.2010 With No rujukan : ( 2 ) KPKT/(07)/COB/3-MPPP/42 .
This Is A CC Copy address personally to me , this is because im the one that shot a online complaint to the ministry and submited the defects report to them personally.
Here Is The letter Page 1 :
Here Is Page 2 :
This Is the Explainations Refering to "Act118,fasal ke 29 , Akta Pemajuan Perumahan ( Kawalan Dan Perlesenan ) 1966.
In this act this is what the residences / owners units lot / jmb / management right to claims from developers prosiding to any defect qouted under
"apa apa kecacatan , pengecilan atau kekurangan lain pada petak atau bangunan atau harta bersama yang menjadi ketara pada pembeli"
Example : Rooftop Units leakage And Common area defects
As for some common area defects,
earlyer developers PR Builders ( Formelry Known As Pembinaan Kasporat )
Has agree to repair back some of the common area defects based on good will even though the libility period has ended
promise and Answer by Mr Abdul Mutalib Bin Makdom Ghani ( Project Executive Of Kasporat ) on his letter to us post out at all notices board of Serinabay Apartment
with refference no : PKSB / BPBSB / S.BAY / COMDFCTS / AMMG 10 ( 037 )
Dated : 15.07.2010 To 2010 JMB Chairman That is me at that time.
1. Owner / JMB / Management must be given 24 months as warranty period by developers from the date of vaccant posession date start. ( we can see it inside Our S&P agreement ) can submit any complaint
2. Owner / JMB / Management within 24 months can issue out letter or complaint forms to developers on the defect acure at lot units or common area defect in serinabay apartment.
3. Owner / JMB / Management will have to wait and give developers 30 days from the date of the complaint forms or letter date, to come back with reply of the defects submited ( All the letter and complaints forms must have aknowledgement from developers ).Developers must reply .
4. After 30 day no reply by developers , Owner / JMB / Management Can ask for qoutations and submit this qoutations with the previous letter attached and with new letter telling the developers this is the cost to repair the defect at own cost and asking for future instructions from developers. In this letter owner / JMB / management is giving another 14 days for developer to act and reply this letter or Owner / JMB / Management will do it accordingly to the cost submited as Claims to developer.
5. After 14 Day from the 30 day earlyer No reply from developer , Owner / JMB / Management can angaged lawyer to issue out letter to the developer lawyer to release out the sum of claims needs to starts works on repairs.According to law the developer lawyer will have to release out the sum of money to the Owner / JMB / Management within 14 Day from the lawyer letter date given to the developer lawyer.
Fact : All these can be avoid if Old 2009 JMB And Robert Bench Management Company Act Accordingly to the rules and regulations. ( Buat Kerja Jangan Tidur Makan Gaji Buta )
Thats All For Now
Thanks
En Mohamad Amin Bin Abdul Kadir
HP : 012-4210765
Subscribe to: