Dec 6, 2010

Wasting Of Water Leakage Already Been 1 weeks Until Now No Actions Taken By The 2010 JMB

Hi! Everyone today I'm going to let all of you see the same problem of water leakage again and again happening here at Serina bay block A building ...this leakage will be accounted to our building water bills and as residences it is our money that used to pay for it ...

look at this picture :

This is at level G block A PBA Riser Rooms , All The water Leakage From Level 22nd Coming Down Like Flood Everyday And The Cleaners Will Have To Suck It Out  Everyday.
The Cause Of Leakage :
At level 22nd The Orange Colour Water Meter unit Is leaking from main PBA pipes going into House Units Meter 

The leakage is not at main pipe with valve , its from joining of main PBA pipes into the House Unit Meter .
In conclusion this water is not bare by the house unit owner water bills but going into building usage water bills and who is paying it ..it is the management using our maintenance money as water bills . This is because PBA will deduct all house unit water bills Block A,B, And C with reading from Main Meter outside building , and consider it as building water usage . So i hope as residence please complaints this matter to avoid any more waste of our money that can be used or keep for other problems in future.

2010 JMB should be aware on this matter as serious , rather then thinking on making money by putting more burden to us as residences.They know how to prioritise which is more important saving as much as possible and maintain , or spend for development but as waste .

That's all for now

Thanks

Dec 5, 2010

The 2010 JMB Attitude That Needs To Be Change ..NOW ! !.

Hi everyone ...As JMB they have to be always aware about our surrounding and sensitive about our neighborhood needs ...as far as i can say the 2010 JMB is more to ACT WHEN BEEN TOLD, No Own Initiative To ACT BEFORE PROBLEM AC CURE .If like this to me they are not doing their jobs for residence interest rather then to WAIT And ONLY Act Upon Complaints.

A Good JMB should always be close with residence ...until now they have not call for residence meeting , they are also following the old JMB style making their own meeting making decisions without residence concern No open for discussion segment not Even quarterly meeting .

These are some few questions for them :

1. Are they going to continues making decision for residence until 1 year period end then do AGM Meeting ?.
2. Where are Monthly Statement Of money Usage by Jiran Wangi Post To the notices board ?.
3. Are they going to discuss with residence on what are they going to do with visitor carp ark here or are they going to implement their own decisions without residence concern ?.
4. When are they going to declare formally the cost of engaging RELA and Jiran Wangi Sdn Bhd To residence ?.
5. Why we can see Mr Steven Yong handling and making decisions on behalf of JMB 2010 on the floor and inside management offices , what happen to the rest 11 person of JMB members. wasn't  it the same like Former Chairman Is Doing on the floor ?.Does all the actions getting Other JMB member concern ?.Or it Is Just Majority Win ?.
6. When are The 2010 JMB going to declare the 1 year earlier Account have it been audited ?.
7. When are 2010 JMB going to Declare And Help Residence on processing in getting and changing name on strata titles that i have heard it is already Out ?.If The JMB act on behalf they can save residence cost on lawyer fees by paying package cost not individual cost .
8. What is the actions and progress on the outstanding payment of maintenance fees not collected by JMB ?.
9. What Is the next actions on helping Shop Units that having difficult time in Serena Bay ?.
10. When are 2010 JMB going to improve Our Facility in Serena Bay ?.

Please Don't just Sit In JMB Letting MR Steven Yong Making All The Decision The Rest Doing Own Things.

Get residence involve in programs and planning by making residence meeting , like what been promise before to do changes from last JMB.Be prepare and open to hear residence complaints .

Again Don't Just DO SOMETHING WHEN RESIDENCE COMPLAINTS But act early , Always be aware and try to understand residence problems and work to improve it .

That all for Now.

Dec 3, 2010

No Action Taken By 2010 JMB Until Now For These Cases

Hi everyone today I'm going to share some issues that is delay until now no action taken by 2010 JMB .

1st case : look at this picture .


2010 JMB can buy so many pillar at our visitor car park but why, that they can't patch up this hole for residences convenience ...is it because they are so busy thinking in making money on renting out this visitor car park to residence that they forgot  to think on the residences needs.It is already been 1 month this hole is here ...how much is this going to cost comparing with the cost of all those pillars.

2nd case : look at this pictures.




Its has been 2 months this renovations works been going on until now it seem that its like "projek terbengkalai" what wrong with this progress , no update by our 2010 JMB to residences it just like taking it easy not important for residence ... Especially during now school holiday nothing can be utilized at this areas.No basket ball , No tennis , No futsal nothing can be played here.2010 JMB should follow up on this matter fast or it will be delay again.This is for the residence not to see but to used.

I really Hope That 2010 JMB not sitting on this Matters ..

That all for now

Thanks .

Nov 9, 2010

Some More Important Issue As Residence We Should Be Aware Because This Is All Our Money ...

Hi!! Everyone today I'm going to share something to as a waste of our money as maintenance fees that we pay every months .

As we all know that all this time we have been hearing JMB has no money to do improvement for us as residences, but now the 2010 JMB is doing some improvement as to me its good but if they cannot know which is to spend and which is to saved then development without control will become a waste .As to me what is control it is Discipline.

What is here are some example that we all can evaluated as whether this problems is UN avoidable or just been ignore by the new 2010 JMB.

My Principal is There "Is No Bad Student Only Bad Leader".

1st Scenario : Look at this picture : Look at the long light on the cycling  its open all day long since 1 week ago .The reason given by the management that, this light switch is centralised with the others light inside our ground floor and if we closed it all the light inside will also be closed and dark , is something to me that unacceptable because we have technician that can do something about it rather than leave it be like that to waste everyday .







2nd Scenario : Look at this picture Below , All this visitors car park this few weeks has been occupied by people that is not visitors and some is residence that would not want to go up the multi storey car park at their own parking lot . All this cars has no visitors pas card leave on theirs dashboard of the cars.To me now 2010 JMB have to strict and fair to all as what i can say this is not fair for the rest of the residence and visitors.



3rd Scenario : Residence has been given statement today 08.11.2010 Of  Oct 2010 Monthly statement payment made and outstanding maintenance fees.Behind this is a Notice stating that to confirm the statement of accounts given. Now below are Picture one sample of a problem statement , in this statement Jiran wangi clerk has done some adjustment with chop of  JMB by the JIRAN WANGI SDN BHD.





My Question Is :

1. When this statement given back to questions the mistake done by them the clerk open out the ledger of collections collected manually to check and confirm the mistake . But why initially they have not check with this ledger before doing this statement out to residence ?.

2. Looking at the statement the Debit and credit is not presented as monthly account statement rather then to me it is just like a letter to residence as formality to get the opening cash balance from Robert bench . Why is if residence that pay in advance 3 month the amount credited out from the month of this statement Oct 2010 is RM330.00 Not RM110.00 Per a month Making the balance is RM220.00. Not RM0.00 As balance ?.

3. What If residence didn't come back to them to rectified the mistake after 14 day , what happen the the money that is the different amount in this case the RM220.00 ?.Where is it going to be keep as Excess Money?.

4. To me know how is the one working for who ?. we residence have check and correct the work that initially they should check before they shoot this statement out ?.

5. How does this clerk going to do adjustment on the mistake at theirs side , when she just chop and amend this statement and give back this statement to me without photocopying this amendment and ask me to sign like what been instructed on the letter given, so that their head offices will know there is a amendment for my statement ?.I will go back to the maintenance office tomorrow to rectified this.

6. Do 2010 JMB check all this ?.

So far i have been told the same mistake from my other neighbour

All this raise the Credibility , Accountability and Transparencies Question in my head to 2010 JMB.

I hope every residence really check this statement and go back if there is anything wrong with it , the most important thing now is to keep all your receipts carefully NOW , THEN and EVER.

That all for now

From people that care .

Nov 6, 2010

Another Implementations By 2010 JMB That In Vain And Jeopardizing Our Building Security.

Hi!..Everyone , today i have just notices that at our car park level 1 entry and exits point connecting to the multi storey car park and block A / B building at the gate got 1 small button that we can push without using our excess card and open the gate to enter our car park area.

Look at this picture :

The White Button If We Push It Can Open The Gate To Enter Our Car Park .

Look At From Different Angle :

Different Angle View


Different Angle View 
My Questions Is :

1. Is this secure to leave the contractors door open without guard ( picture as below ) and now make new button for people that don't have card to exit this gate ( above picture ) through our car park ?.

2. What is the justifications to have this button when earlier the 2010 JMB has already given out to residents a letter telling us that they as strengthening the security and advising us always to have the excess card to in and out this building ?.

3. Even though we have camera , but if the thief or anyone that have committed crime in this building can just walk in and out using any of these 2 doors . who can reconised it and know it ?.

Look At this Picture :

Building  Contractors Door View At Block B Ground Floor Near Lifts With NO Guards 


Building  Contractors Door View At Block B Ground Floor Near Lifts With NO Guards 


Building  Contractors Door View At Block B Ground Floor Near Lifts With NO Guards 

Oct 28, 2010

IMPORTANT ISSUES STILL HAVEN'T BEEN SETTLED BY 2010 JMB

Hi!.. Everyone I'm highlighting things that really important to us as residences of serinabay apartment .
apart from all the development bring by the current JMB 2010 but yet have not been declare by them

1. UN audited account from December 2008 to November 2009 ( 1 set Of accounts ) And December 2009 to November 2010 JMB ( 1 Set Of accounts ) initially when I'm the chairman of 2010 JMB for the first 3 months , i have already sign document saying that Robert bench will only be resign after they have settled making accounts From December 2008 to the agreement Letter dated 23.06.2010 and audited in Oder for them to be released by 2010 JMB , but now the accounts as far as now has not been declared and presented to resident yet has not been audited but Robert Bench has been replaced by Jiran wangi . I hope the Current Chairman Of JMB 2010 , will consider this as really important in order for them to hand over In future for the new JMB 2011.

Notes : About Accounts history .

Kasporat Developer
December 2007 until November 2008  Accounts Has been audited And presented To COB

FA Resources / JMB 2009 / Robert Bench 
December 2008 Until November 2009 Accounts Has not been audited and presented to COB
- Fa Resources last working day JULY 2009
- Robert Bench Take Over AUGUST 2009

Robert Bench / JMB 2010 / JIRAN WANGI
December 2009 to November 2010 Accounts Has Not been audited and presented to COB.
- 2010 JMB take over 19.06.2010
- Robert Bench Last Working Day SEPTEMBER 2010.
- JIRAN WANGI take over 1st OCTOBER 2010.

2. Strata Titles : until now there is no feedback from 2010 JMB and developers Or our lawyer regarding our strata titles . just to share according to law no renovations can be made to extend the extra 200sft to b renovated as rooms or any other works until strata is out .But now everyone has already do renovations i don't know from where does this authorisations comes from. If we see  our S&P agreement its just tell us the house size is 700sft only Extra 200sft is common areas. I really hope that Our strata Titles has no problem in getting it and renovations that has been done would not be effected.

Please residence take notes on this matter , cause it is really important to us in saying this units belong to us.

That all for now

All the Best

Oct 14, 2010

Another Good Effort But Still Theres A Loop Hole To Improve Other Wise It will Be A Waste Of Our Money.

Hi! Everyone ...Its seem That Now Our 2010 JMB Is Working For Improvement , But Still I Can see Some Loop hole That Can be Put Into Considerations As If It Not Been Rectified It Will Be A waste Of Our Residences Money ....

Look At this Picture :

A Very Nice Iron Rod Doors Expensive Too , Very Good Implementations For First Impressions And Security Wise , And As for Emergency A Rela Units Is Posted There In Case Of Anything Happen For Observations.

But Now Look At this Picture :

What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift  Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm.

What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift  Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm.

What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift  Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm.

What Happen To This Door , Left Out Open From Morning To Evening , This A Door Beside Block B Lift  Used By Building Contractors In And Out Of This Building From 8:30am Until 5:00pm.

Look At this Picture No Rela Units Posted There By The 2010 JMB :

If Im The Residence Or Visitors That Would Like To Come In Without Following Instructions Given On Letter To All Residences Recently That Says No card No Entry And All Visitors Have To register , Can Easily Say The Hell With That Letter Nobody  Can Stop Me Here , I Can Go In And Out Easily . If I'm Going To Block C , Gym room , Swimming Pools , Game Rooms To Do Vandalism This Is A Good Entrance For Me Just By Going To First Floor By Lift Or Stairs I can Just Walk There And Do My Things, No Rela Can Stop Me.

Now Look At This Picture See How Many Escape Roots Available Here If A Thief Going To Escape :

Right View

Left View 
A Thief Will Never Used The Front Escape Roots Because Its Too Public In The Day , But Good At Night .
A Lot Of Scenario We Can Think Of If This Door Left Unattended.

It Will Be A Waste To Have Invested Huge Sum For  All The Door But Left This Door Like This .

In The End It Will Be Back At Square 1 = 0 Impact ( Good Intention But Poor Implementations )

I Think One Of the reason maybe 2010 JMB will Give : NO MONEY

But My Big Questions Is :

1. Why Initially When Going To engage New Security Company All This Aspect Has Not Been Consider : example : How many Man power needed , How many post Needs To Post Guard .

2. Where Is the Quotations Or Tender For this Security Company and Management Company

3. If there Is Quotations Of tender All Our requirement Will Be take as A must and Company can Offer Something More To Value add Our Requirement.

4. The Reason To Cut Cost Is something Irrelevant Compare To security The Most important aspect that we residence Pay the maintenance Even it Is costly but It Must be With good Quality ,
Sometime It is not Fair To ask For A Porche For The Prices Of A Proton.Its Has To Be A Win Win Situations.

Now If  2010 JMB Keep Pushing For More But Company Cannot Bare the cost It will Be back to Square One.

Hopefully They Can Solved It .

That All For Now .

Oct 6, 2010

Good Intension But Poor And Bad Implementations Of Works Of Improvement Done By 2010 JMB Of Serina Bay Apartment

Hi Everyone !...I'm Going to Share Today Something To Me is

 "Good Intention But Poor And Bad Implementations"

Done By Current 2010 JMB Member .

Look At this Picture :

THE ALIGNMENT OF THE STEEL BARS AT THE SIDE IS NOT PROPERLY ALIGN PROPERLY AND STRAIGHT MAKING OUR ROAD NARROW.

THE ALIGNMENT OF THE STEEL BARS AT THE SIDE IS NOT PROPERLY ALIGN PROPERLY AND STRAIGHT MAKING OUR ROAD NARROW.



WHY DO WE NEED TO HAVE MORE THAN 2 FEET OF SPACES FROM THE FENCES TO PUT THIS STEEL BARS . THE  2010 JMB , DO THEY KNOW THAT IF THEY EXTEND MORE THAN 2 FEET FROM THE FENCES IT WILL MAKE OUR ROAD NARROWER .

NOW LOOK AT THIS PICTURE WHY SOME ARE MORE THAN 2 FEET'S FROM THE FENCES SOME ARE LESS .
THE STEEL BARS ARE NOT STRAIGHT AND NOT PROPERLY ALIGN .

NOW LOOK AT THE RUBBISH DUMP THAT PLACED HERE FOR SO LONG ,
IS THIS WHY THE  2010 JMB   HAVE DO LIKE THIS.
"THIS CAN BE THE REASON BUT THIS IS NOT THE SOLUTIONS" 

NOW LOOK AT THE RUBBISH DUMP THAT PLACED HERE FOR SO LONG ,
IS THIS WHY THE  2010 JMB   HAVE DO LIKE THIS.
"THIS CAN BE THE REASON BUT THIS IS NOT THE SOLUTIONS" 

MY SUGGESTIONS : 

1. Clear Off ALL Rubbish Dump
2. Move Back the Steels Bars Up to 2 Feet's From The Fences
3. Properly Align Back In straight Line
4. To Obstruct People From Parking At the Locations In The First Picture Above , The steel Bars Will Have   To Go In more Align In ,Straight Line Side To Side Of The Cements , Looking Like Straight Triangle Line.
5. Why Do We Have To Used Allot Of Steels Pipe Instead Of Using Chains Minimizing The Cost Of steels Bars. If Residents Still Park JMB Can just Clamp It .
6. The "No Parking Box" Draw On The Road At entrance Block C Should Be Bigger Reaching The Fences In straight Box Line .No Need The 2 Cone.
7. "No Parking Box" Should also been Draw at All Entrance And Place Where People Cannot Park Surrounding This Building.

That All For Now

All Residence Should Be Alert And Aware About Our Surrounding ,

JMB 2010 WORKS FOR US THE RESIDENCE OF SERINA BAY ,

NOT THE JIRAN WANGI ONLY AS MANAGEMENT .

THERE ONLY BAD LEADER NOT BAD FOLLOWER.

THEY HAVE TO BE ACCOUNTABLE AS FOR THEY HAVE HOLD POSITIONS AND UNDERSTAND THE COMMITMENT THEY HAVE TO GIVE WITH NO SALARY  ...

"SALARY CAN BE ALSO THE REASON BUT IT IS NOT THE SOLUTIONS" 

Sep 8, 2010

Request By Mr Huzaifah To Me And Also The Residences Of Serinabay Apartment

Dear Residence , Mr Huzaifah Has Request Me To Take Out His Contact Number And Email as To Him This Is Personal Matter... So I hope All the Residence Understand That this Is his Personal Request.

This Can Be Solved If The Current 2010 JMB Will declare Out Their Organisations Chart with Picture And Contacts Number Like Normally You Can See At Other Flat Building Residential  For The Residence Concern ....

What The current 2010 JMB Should Remember That , They Are Representing The Residences Here ..Promising To Residences To Hold Post And Do Community Works Here In Serinabay Where by Residence And JMB Should Be Working Together Closely ...Not Like Stay In Meeting Making Decisions  But Not On the Ground Together Working Hand In Hand As Much Time That They Can Give.

This Is Community Work No pay Given . But A Community Servant Workers Should Always Take This As Your Motto

"I'm Doing This Because I Have agreed To Hold Positions And I Only hope Gods Will Repays Back All The Goodness , Responsibility And Commitment I Have Given Here"


So residence Please Don't Call Or Email Him And All The 2010 JMB Committees Okay.........

This Is A Copy Of Email Send To Me By Mr Huzaifah Magbool AJK OF 2010 JMB :
....................................................................................................................................................................


From:Huzaifah Magbool (huzaifahm@yahoo.com) 
Sent:Wednesday, 8 Sep, 2010 12: 59 AM
To:pmp_200@hotmail.com
Cc:jimyooi (jimyooi@yahoo.com); ab2211@streamyx.com; aini_007@hotmail.com; cheahadeline22@gmail.com; ha.ong62@yahoo.com; marwan@rapidpg.com.my; mohamadarshad.yusoff@ymail.com; theanchew_leong@hotmail.com
Salam Mr Amin,

Referring to your latest blog at your site, i would like to request you to remove the posting regarding the contacts of
Serina Bay JMC. It is not your prerogative anymore to disclose any information regarding us to anybody unless you get prior approval from us. I consider my contacts to be PRIVATE & CONFIDENTIAL and i will give it to people whom i want to personally.

Please remove  the posting as soon as possible.

Thank you.

Please don't simply publish personal emails sent to you publicly. You should get prior approval from the author to do that. 

History Repeating Again Lastime From Old JMB 2009 Now New JMB 2010

Hi everyone!.. Today I'm sharing With All The Residences What Is To Me History Repeating Again ...And I Blame It On The MASTERMIND Of 2010 JMB MR Steven Yong As 2010 JMB Sectary That Have Vito Power With His Follower Of 2010 JMB Comity's That Hold the Majority Vote In The 2010 JMB Comity's, And The Reason Why I Resign At First When I Know The Real Genuine Comity's Hold No Majority Against His Conspiracy Teams With His Own Agenda ...Using Racist Issue Indirectly To Make Issue And Questions My credibility In The Ends I Have Answer All And Still Proofs I'm Innocent .

 I Have been Doing Checking On My Part Also shows That He At His Old House Also Making A lot Of problems To The Comity's There Now Move Here To Serinabay Apartment...

The Act Of Doing Things Without Transparency And Accountability After One JMB To The New One Right Now.

1. Engaging New Property Management Replacing Robert Bench Without Any Open tender To The public And Putting Out Notices Of Tender Open And Closing Date To the Notices Board ...

2. The Results Has To be Post Out To The notices Board As For Residences Concerns.

3. What Happen To The Code Of Conduct That He Has Introduce Preventing Me To Questions Robert Bench Before Making Me Just Like A Puppets... Is This A Act Of Righteousness .That Why I Would not Let My Self To Puppet To him And Resign.

Fact : Its doesn't Matter What The Reason Is Whether This New Company Prices Is Cheaper Or Higher Fees To Robert Bench Charges To Serinabay Apartment But It Has To Be Transparent And Declare Out To The Public.To Me What Is The 2010 JMB Doing Is Contradict With Penang State Government Policy CAT ( Credibility , Accountability And Transparency )

                                            "Ini Seperti Cakap Tak Serupa Bikin"

For All Our Info All Project Give Out By State Government Now To Even RM5K Has To Have At Least 3 Quotations And State Government Has right To Ask The Winner To Less Out A bit More On the winning Amount If required.. As For Value For Money Concepts ...Example : YB Qoid Then Guan Award RM5K To the surau Of Serinabay Apartment To Extend The Rooftop But Needs To Have At Least 3 Quotations In Order To award It To Contractors That will Do this Works as Reasons This Is Public Money Not My Personals Money I Cannot Do this As What I like .....

But Now This Mr Steven Can Engage New Company For RM8K Without Any Quotations ..Now What Is This . Doesn't That Our Residences Money ... I Heard Some Of the Comity's Doesn't Agreed But Since He Has Follower And The Followers Holds Majority Vote He Has Vito Power...

This Is Why He Conspires Against Me Because I'm Trying  To Implement Buying Procedures Like What I have Mentions In meeting But Taken out The Fact In Meeting Minutes send To COB ... A Lot of things has Been taken Out On My Resolutions Said Out In the 19.06.2010 AGM Meeting Minutes And when I Brings It In The 2010 JMB Meeting Been taken out Clearly ...Example : Buying RM2K Below What Is The Procedure , Buying More Then 2K To RM10K  What Is The Procedure All Has Been Erased But Said Out Loud And Minuted In The AGM Meeting Minutes On 19.06.2010, But What I'm Very Sad Is His Followers In the 2010 JMB Comity's Follow Him Blindly Without Any Consent...This is The Other Reason Why I Resign ..And Raise A lot Of Questions?. Example What Is his Motifs And Agenda ..It Is Money Or Personal Satisfactions ?.

In Conclusions To Me Now :

THE CURRENT 2010 JMB IS DOING WHAT THE OLD 2009 JMB DOING MAKING DECISION WITHOUT RESIDENCES CONSENT  AND TRANSPARENT .. NOT MAKING ANY CHANGES.


Dear Mr Steven I'm Not Scare Of You And Resign ... I Resign Is to Make Sure There Will Be A Check And Balance In Your Actions ... Just To Add Why Is You Always Hide Behind People Making Decisions But Yet Not Brave Enough To Replace My Post As Chairman Until Now ....


"Jangan Baling Batu sembunyi Tanggan"


Oop!!.. Sorry I Forgot You You Have Told Me Before That You Don't Understand Malay You didn't Go To The Sekolah Kebangsaan And You Don't Really Care About Malay Language.


Anyway I Think You Understand ....